A reinforced porous layer installed into the bunker profile.

A controlled construction sequence intended to protect sand, support drainage and improve long-term bunker stability.

Bunker liner cross section
System overview

Five layers. One performance objective.

Selected bunker sand: chosen for playability and visual character.
Porous bonded layer: forms a seamless and permeable surface.
Reinforcement: supports the reduced-thickness composite structure.
Prepared base: shaped and stabilised to the required profile.
Drainage network: carries infiltrated water away from the bunker.
Installation sequence

Controlled, repeatable delivery.

01

Survey

Measure area, slopes, drainage condition and access.

02

Prepare

Complete drainage and create a stable, even base.

03

Reinforce & apply

Place reinforcement and install the porous bonded layer.

04

Inspect & finish

Complete quality checks before placing selected sand.

Installation evidence

Film and document the details that demonstrate quality.

Prepared base and drainage layout.
Reinforcement position and overlap details.
Mixing, application and thickness control.
Finished permeability and visual inspection.
Sand placement and final profile.